Home / Projects / Storage equipment
FEATURED PROJECT
Storage equipment prepared for dispatch.
Fuel storage tanks fabricated, finished and tested at our Rawang factory, then prepared for transport to site.
THE CHALLENGE
What the customer needed.
[to be confirmed] Describe the customer’s requirement: capacity, liquid stored, site conditions, standards and deadline.
OUR SCOPE
What Dancomair delivered.
- Design and drawings to the agreed specification
- Fabrication and welding of the tanks
- Shot blasting, coating and painting
- Pressure and leak testing before dispatch
- Preparation for transport to site
GALLERY
From the factory floor.
Real project photographs to be supplied by Dancomair.
SUPPLIED EQUIPMENT
Specification summary.
Figures to be completed from the project record.
| Item | Detail |
|---|---|
| Tank type | [to be confirmed] |
| Capacity | [to be confirmed] |
| Quantity | [to be confirmed] |
| Standard | [to be confirmed] |
| Verification | Pressure and leak test before dispatch |
Customer name, location and results are published only with client approval.
RELATED PRODUCTS
Products used in this project.
- STORAGE TANKS
Aboveground storage tanks
Single wall 1,000–250,000 L · self-bunded 1,000–200,000 L
View product - STORAGE TANKS
Underground double wall tanks
1,000–200,000 L · fire-rated and AdBlue options
View product - DISPENSING
Dispensing & unloading skids
Packaged modules for fuel transfer and dispensing
View product
Not sure which product fits?
Share your application, capacity and site conditions, and our engineers will recommend the right equipment.